Photo Gallery: Summer Renovation Projects at Holy Cross Wide-Ranging

Numerous repair and maintenance projects take place on campus over the summer

August 21st, 2013 by 


Slide 1. The Millard Arts Center is undergoing a renovation and expansion.


Slide 2. The Millard Arts Center is undergoing a renovation and expansion.


Slide 3. The Millard Arts Center is undergoing a renovation and expansion.


Slide 4. The Millard Arts Center is undergoing a renovation and expansion.


Slide 5. The Millard Arts Center is undergoing a renovation and expansion.


Slide 6. Brooks Concert Hall is also receiving a renovation.


Slide 7. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 8. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 9. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 10. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 11. O'Kane Porch is being renovated.


Slide 12. The Dinand Library roof is being replaced, and a roof drain is being installed.


Slide 13. The Main Reading Room in Dinand Library receives a fresh coat of paint.


Slide 14. Improvements are made to the lower softball fields.


Slide 15. The Hogan and Loyola parking lot were repaved. The wood guardrail at Loyola was also replaced.


Slide 16. New dasher boards were installed in the Hart Center ice rink.


Slide 17. Mulledy Hall's lower roof is being replaced.


Slide 18. Heating, ventilation and air conditioning equipment on the roof of O'Neil Hall is being removed and replaced. Steel supports and a new roof are being added.


Slide 19. Stairs adjacent to Brooks Concert Hall were rebuilt.


Slide 20. Stairs adjacent to Brooks Concert Hall were rebuilt.


Slide 21. The sidewalks in Kimball Quad were rebuilt.


Slide 22. Repairs are being made to the smokestack on Kimball Hall.


Slide 23. The parking garage receives some masonry repairs and maintenance.


Slide 24. The parking garage receives some masonry repairs and maintenance.


Slide 25. Several restrooms in the Hogan Campus Center are being renovated.


Slide 26. The heating, ventilation and air conditioning wall units are being replaced in the rooms of Loyola Hall.


Slide 27. The ceiling on the second floor of Kimball Hall, home to the Food Court, is being replaced.


Slide 28. The Beaven Hall entrance is being restored.


Slide 29. The air conditioning units are being replaced at Ciampi Hall.


Slide 30. The gutters and downspouts are being replaced at Alumni Hall.

Students, faculty, and staff who’ve been away from Holy Cross might notice some changes when they return to campus.

Under the auspices of the Physical Plant department, crews worked throughout the summer to maintain facilities, grounds and infrastructure.

View some of the projects that took place over the past few months.

Photography by Paula Cunanan ’14 and Christian Santillo

| More

Comments are closed.

Sort By:
or
10/21/14 ‘US public schools are better than they’ve ever been’
10/17/14 Holy Cross Marks 25th Anniversary of El Salvador Murders With Series of Events
10/15/14 Grammy-Winning Holy Cross Professor to Give Talk on ‘The Birth of Stereophonic Recording’
10/15/14 ‘The Bottom Line: helping Worcester students obtain collegiate and professional success’
See All
See All

Featured Videos

See video
Artist-in-Residence Cristina Pato and Renowned Composer Osvaldo Golijov to Lead Concert and Panel Discussion

Watch Video >
See video
Environmental Champion Slottje ’89 on Crusade to Protect America Against Fracking

Watch Video >
See video
Strong Alumni Support Makes for Record-Breaking Year in Giving to Holy Cross

Watch Video >
More

What’s Happening on Campus

10/23/2014

Celebrating 50 Years of Student Affairs at Holy Cross

See More >
10/25/2014

Craft Demonstrations by Refugee Artisans of Worcester

See More >
10/25/2014

Tableaux Vivants of the Italian Presepe

See More >
10/28/2014

Dinand in the Dark

See More >
More

Holy Cross in the News

10/10/14

‘Holy Cross’ Sean Gustin never rests’

Worcester Telegram & Gazette

The Worcester Telegram & Gazette profiled College of the Holy Cross student Sean Gustin ’16  as a stand out scholar- athlete who is a member of both the Crusader...

10/06/14

‘Any way the wind blows’

Worcester Telegram & Gazette

The Worcester Telegram & Gazette recently featured a photo gallery of the first annual New England Collegiate Marching Band Festival, hosted by the College of the Holy...

09/22/14

‘Tesla’s removal of patent restrictions a boost for electric cars’

Worcester Business Journal

In an op-ed for the Worcester Business Journal, Christine Fimognari ’15 discusses a decision by Tesla, a manufacturer of electric cars, to remove patent restrictions in the...