Photo Gallery: Summer Renovation Projects at Holy Cross Wide-Ranging

Numerous repair and maintenance projects take place on campus over the summer

August 21st, 2013 by 


Slide 1. The Millard Arts Center is undergoing a renovation and expansion.


Slide 2. The Millard Arts Center is undergoing a renovation and expansion.


Slide 3. The Millard Arts Center is undergoing a renovation and expansion.


Slide 4. The Millard Arts Center is undergoing a renovation and expansion.


Slide 5. The Millard Arts Center is undergoing a renovation and expansion.


Slide 6. Brooks Concert Hall is also receiving a renovation.


Slide 7. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 8. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 9. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 10. Tree and shrub landscaping was reworked around the cemetery area, where Jesuits who lived and worked at Holy Cross are buried. The work was undertaken to open up the heavily used sidewalks around the cemetery that were overgrown.


Slide 11. O'Kane Porch is being renovated.


Slide 12. The Dinand Library roof is being replaced, and a roof drain is being installed.


Slide 13. The Main Reading Room in Dinand Library receives a fresh coat of paint.


Slide 14. Improvements are made to the lower softball fields.


Slide 15. The Hogan and Loyola parking lot were repaved. The wood guardrail at Loyola was also replaced.


Slide 16. New dasher boards were installed in the Hart Center ice rink.


Slide 17. Mulledy Hall's lower roof is being replaced.


Slide 18. Heating, ventilation and air conditioning equipment on the roof of O'Neil Hall is being removed and replaced. Steel supports and a new roof are being added.


Slide 19. Stairs adjacent to Brooks Concert Hall were rebuilt.


Slide 20. Stairs adjacent to Brooks Concert Hall were rebuilt.


Slide 21. The sidewalks in Kimball Quad were rebuilt.


Slide 22. Repairs are being made to the smokestack on Kimball Hall.


Slide 23. The parking garage receives some masonry repairs and maintenance.


Slide 24. The parking garage receives some masonry repairs and maintenance.


Slide 25. Several restrooms in the Hogan Campus Center are being renovated.


Slide 26. The heating, ventilation and air conditioning wall units are being replaced in the rooms of Loyola Hall.


Slide 27. The ceiling on the second floor of Kimball Hall, home to the Food Court, is being replaced.


Slide 28. The Beaven Hall entrance is being restored.


Slide 29. The air conditioning units are being replaced at Ciampi Hall.


Slide 30. The gutters and downspouts are being replaced at Alumni Hall.

Students, faculty, and staff who’ve been away from Holy Cross might notice some changes when they return to campus.

Under the auspices of the Physical Plant department, crews worked throughout the summer to maintain facilities, grounds and infrastructure.

View some of the projects that took place over the past few months.

Photography by Paula Cunanan ’14 and Christian Santillo

| More

Comments are closed.

Sort By:
or
09/02/15 Chapel Artist Series Returns with World-Famous Organists for 2015-16
09/01/15 Holy Cross Grad and Visiting Professor Receive Prestigious American Council of Learned Societies Fellowship
09/01/15 ‘Holy Cross’ Amanda Beaver Makes 40 Under Forty List’
08/31/15 Holy Cross to Host Series of Events to Honor the Pope’s Historic U.S. Visit
See All
See All

Featured Videos

See video
Photo Gallery, Video: Members of Class of 2019 Move Into Their New Home

Watch Video >
See video
Video: Idyllic Summer Months Bring Different Feel to Holy Cross Campus

Watch Video >
See video
Video: How Spring Arrives at Holy Cross

Watch Video >
More

What’s Happening on Campus

09/02/2015

Katrina Then and Now: Artists as Witness

See More >
09/02/2015

Kick Off Career Carnival

See More >
09/02/2015

Stump! Trivia

See More >
09/03/2015

Katrina Then and Now: Artists as Witness

See More >
More

Holy Cross in the News

08/31/15

Hurricane Katrina Exhibit at Holy Cross Featured on National Radio

'America This Week' on SiriusXM

In the honor of the 10th Anniversary of Hurricane Katrina, Daina Harvey, assistant professor of sociology at the College of the Holy Cross, will present “Katrina Then...

07/30/15

Holy Cross Ranks No. 55 on Forbes’ List of America’s Top Colleges

Forbes.com

The College of the Holy Cross ranked No. 55 overall and No. 46 among private colleges on Forbes’ list of America’s Top Colleges. Forbes rated schools on an ROI scale with...

07/14/15

Money Magazine Ranks Holy Cross No. 18 Among Best Liberal Arts Colleges in the Country

The College of the Holy Cross ranks No. 18 on Money Magazine’s list of “The 50 Best Liberal Arts Colleges,” and No. 89 overall  on Money’s list of “Best...