Logo for College of the Holy Cross

Search

Photo Gallery: 2016 Summer Construction, Renovation and Maintenance Across Campus

August 31st, 2016 by 

Sidewalk outside Stein Hall
Street print coating is applied over asphalt on the sidewalk outside Stein Hall. Photo by Tom Rettig

Work is done in Swords Hall
Work is done in Swords 226. Photo by Tom Rettig

Chapel doors renovated
Doors of St. Joseph's Memorial Chapel are restored. Photo by Tom Rettig

Chapel organ work
Work is done on the organ in St. Joseph Memorial Chapel. Photo by Tom Rettig

Chapel organ work
Work is done on the organ in St. Joseph Memorial Chapel. Photo by Tom Rettig

Fenwick Hall mansard work
Mansard of Fenwick Hall is restored. Photo by Tom Rettig

Hogan Ballroom renovation
Hogan Ballroom and Dunn Lounge are renovated. Photo by Tom Rettig

Hogan Ballroom renovation
Hogan Ballroom and Dunn Lounge are renovated. Photo by Tom Rettig

Hogan Ballroom renovation
Hogan Ballroom and Dunn Lounge are renovated. Photo by Tom Rettig

Hogan Ballroom renovation
Hogan Ballroom and Dunn Lounge kitchen is renovated. Photo by Tom Rettig

Sidewalk renovation near cemetery
Street print coating is applied over asphalt on the sidewalk near cemetery. Photo by Tom Rettig


Fitton Field turf is replaced. Photo by Tom Rettig

Dinand side stairs renovated
Exterior stairs on the east side of Dinand Library are replaced. Photo by Tom Rettig

Hart Center progress
Progress continues on the Hart Center at the Luth Athletic Complex. Photo by Tom Rettig

Contemplative Center progress
The Thomas P. Joyce ’59 Contemplative Center nears completion. Photo by Tom Rettig

As the New England sun shone down over Mount St. James during the summer months, maintenance and construction crews worked to prepare campus for students’ return in the fall.

With more than 45 projects reaching all corners of campus, crews worked throughout the summer to ready the residence halls, academic buildings, offices, and recreational facilities.

These projects ranged from fresh coats of paint and wardrobe replacements in residence halls, to the installment of Dinand’s new east exterior staircase, to the complete renovation of the Hogan Ballroom and Dunn Lounge.

Additionally, progress continues to be made on the Hart Center at the Luth Athletic Complex at the top of the Hill, and the Thomas P. Joyce ’59 Contemplative Center in West Boylston, Mass is nearing completion.

View the latest photos of the construction and learn more about the Hart Center at the Luth Athletic Complex and the Thomas P. Joyce ’59 Contemplative Center on the Become More website.

Related information:

| More
Tags
Categories
News, Photo Galleries

Comments are closed.